Garza Contracting LLC

Commercial · Epoxy coating

Tile adhesive removal and flake floor

Decades of tile adhesive ground off a commercial slab, then finished with a grey flake system.

The same room finished with a high-gloss grey flake epoxy floor
Commercial room during surface preparation, with tile adhesive being ground off the concrete and dust-collection equipment in use

How a job runs

Four steps, no surprises

You will know what is happening in your space, when, and what it costs before anybody starts grinding.

  1. 01

    Walkthrough & Estimate

    We come to the site, test and evaluate the existing slab, talk through how the space actually gets used, and put a written number in your hands.

  2. 02

    Surface Preparation

    Grinding, shot blasting, or tile and adhesive removal with dust-controlled equipment, then patching and profiling until the substrate is genuinely ready.

  3. 03

    Installation

    Coatings, decorative systems or flooring installed to spec, with cove base, striping and transitions detailed as part of the job rather than as an afterthought.

  4. 04

    Final Walkthrough

    We walk the finished floor with you, review cure times and what the surface can take, and leave you care instructions before we clear out.

Contact

Get an estimate

Tell us about the space: square footage, what happens in it, and what the floor looks like now. We will follow up to schedule a walkthrough.

Hours
Available 24/7, including nights, weekends and plant shutdowns
Based in
Greenville, South Carolina